No. |
Authors |
"Title" |
Company, Address |
Month, Year |
Pages |
Download |
1. |
D. N. Lutovac, D. Mihajlovi}, M. Dimitrijevi} |
Recorder of irregular events for the railway signalling systems (in serbian) |
Institute Kirilo Savi}, |
15th of October, 1991. |
pp. 1-7 |
|
2. |
D. N. Lutovac, M. Ivanovi} |
Microcomputer-based interlocking system for A railway station (In serbian) |
Institute Kirilo Savi}, |
23rd of October, 1991. |
pp. 1-10 |
|
3. |
D. N. Lutovac, and others from IKS and YR |
Guidelines and technical requirements for the electronic interlocking systems for the speeds over 250 km/h, for Yugoslavian Railways (in Serbian) |
Institute Kirilo Savi}, |
July, 1992. |
pp. 1-30 |
|
4. |
D. N. Lutovac, A. G. Reid, D. V. Du~i}, M. G. Eldridge |
report on |
Connell Wagner Ltd., |
February, 1993 |
pp. 1-30 |
|
5. |
|
Connell Wagner Ltd., |
4th of October, 1995 |
pp. 1-6 |
|
|
6. |
karangsari - |
Connell Wagner Ltd., |
21st of February, 1996 |
pp. 1 |
|
|
7. |
legok - |
Connell Wagner Ltd., |
23rd of February, 1996 |
pp. 1 |
|
|
8. |
upfield - Checking of
the signalling arrangement, PTC (PUBLIC TRANSPORT corporation) |
Connell Wagner Ltd., |
26th of February, 1996 |
pp. 1-2 |
|
|
9. |
patuguran - |
Connell Wagner Ltd., |
15th of March, 1996 |
pp. 1 |
|
|
10. |
kretek - |
Connell Wagner Ltd., |
28th of March, 1996 |
pp. 1-2 |
|
|
11. |
bUMIAyU - |
Connell Wagner Ltd., |
18th of April, 1996 |
pp. 1-2 |
|
|
12. |
kroya - |
Connell Wagner Ltd., |
18th of June, 1996 |
pp. 1-3 |
|
|
13. |
kroya - |
Connell Wagner Ltd., |
8th of July, 1996 |
pp. 1-11 |
|
|
14. |
bu yai - Block
circuits checking, state railway of |
Connell Wagner Ltd., |
27th of August, 1996 |
pp. 1 |
|
|
15. |
|
Connell Wagner Ltd., |
17th of September, 1996 |
pp. 1-2 |
|
|
16. |
D. J. Ness, D. N. Lutovac |
indonesian interlocking test guide, rev.01, WESTRACE FAT REPORT |
Connell Wagner Ltd., |
15th of October, 1996 |
pp. 1-11 |
|
17. |
upfield line
re-signalling project- signalling arrangement design report, PTC (PUBLIC TRANSPORT corporation) |
Connell Wagner Ltd., |
29th of November, 1996 |
pp. 1-2 |
|
|
18. |
legok and karangsari
- |
Connell Wagner Ltd., |
2nd of December, 1996 |
pp. 1-3 |
|
|
19. |
procedure for checking of signalling design |
Connell Wagner Ltd., |
31st of January, 1997 |
pp. 1-2 |
|
|
20. |
Resignalling of
Subiaco Station ( |
Connell Wagner Ltd., |
11th of March, 1997 |
pp. 1-6 |
|
|
21. |
D. N. Lutovac, N. G. Mόller |
SICAS (Siemens) CBI system General Description, V 5.0 |
Siemens
Ltd. |
7th of November, 1997 |
pp. 1-51. |
|
22. |
Perth-Kalgoorlie line
Resignalling ( |
Siemens
Ltd. |
6th of June, 1998 |
pp. 1-4 |
|
|
23. |
Ranking of various
Computer Based Interlocking (CBI) systems for PTC (Railways |
Siemens
Ltd. |
6th of June, 1998 |
pp. 1-4 |
|
|
24. |
Analyses of SICAS (Siemens)
CBI system against expected PTC (PUBLIC TRANSPORT corporation) |
Siemens
Ltd. |
6th of June, 1998 |
pp. 1-16 |
|
|
25. |
Analyses of Diagnostic and Maintenance features of SICAS (Siemens) against the Australian technical requirements. |
Siemens Ltd. |
6th of June, 1998 |
pp. 1 |
|
|
26. |
Limitations of SSI (BR / Westinghouse / GEC) |
Siemens
Ltd. |
6th of June, 1998 |
pp. 1-7 |
|
|
27. |
Limitations of WESTRACE (Westinghouse) |
Siemens
Ltd. |
6th of June, 1998 |
pp. 1-6 |
|
|
28. |
Basic Characteristics of WESTECT ATP (Westinghouse) |
Siemens
Ltd. |
6th of June, 1998 |
pp.1-2 |
|
|
29. |
Review of the available documentation and features
for SIMIS W |
Siemens
Ltd. |
6th of June, 1988 |
pp. 1-3 |
|
|
30. |
Limitations and Advantages of SIMIS W (siemens) CBI (computer-based interlocking) system |
Siemens
Ltd. |
6th of June, 1988 |
pp. 1-4 |
|
|
31. |
PRICE ESTIMATE OF THE
SSI (BR / Westinghouse / GEC) BASED SOLUTION FOR |
Siemens
Ltd. |
6th of June, 1988 |
pp. 1-4 |
|
|
32. |
Westrail RFT
Projects, |
Siemens
Ltd. |
11th of March, 1999 |
pp. 1-19 |
|
|
33. |
Australian Functional Description - Signalling Principles and Practice |
Siemens
Ltd. |
15th of April, 1999 |
pp. 1-83 |
|
|
34. |
GEOGRAPHICAL INTERLOCKINGS, PTC (PUBLIC TRANSPORT corporation) |
Siemens
Ltd. |
3rd of November, 1999 |
pp. 1-3 |
|
|
35. |
SIGNALLING EQUIPMENT ON
KOSOVO ( |
Siemens
Ltd. |
3rd of November, 1999 |
pp. 1-2 |
|
|
36. |
COMPETITIVE PRODUCTS FOR WORLDWIDE MARKET |
Siemens
Ltd. |
29th of November, 1999 |
pp. 1-4 |
|
|
37. |
LOW COST SIMATIC S5-95F (siemens) BASED L-XING |
Siemens
Ltd. |
10th of December, 1999 |
pp. 1-8 |
|
|
38. |
|
Siemens
Ltd. |
1st of March, 2000 |
pp. 1-8 |
|
|
39. |
FAIL SAFE COMMUNICATION BY SIMATIC S5-95F (siemens) |
Siemens
Ltd. |
8th of March, 2000 |
pp. 1-2 |
|
|
40. |
Low cost L-xing controlling system based on SIMATIC S5-95F (siemens) hardware |
Siemens
Ltd. |
30th of June, 2000 |
pp. 1-5 |
|
|
41. |
LOW COST COMPUTER-BASED LEVEL CROSSING SYSTEM |
Siemens
Ltd. |
30th of June, 2000 |
pp. 1-5 |
|
|
42. |
WCRM
- WEST COST MAIN LINE RESIGNALLING PROJECT : |
Siemens
Ltd. |
24th of July, 2000 |
pp. 1-6 |
|
|
43. |
Approval Process of SIMIS W
(siemens) in |
Siemens
Ltd. |
15th of October, 2000 |
pp.1-19 |
|
|
44. |
PRICE ESTIMATE OF THE
WESTRACE SYSTEM FOR |
Siemens
Ltd. |
20th of June, 2001 |
pp. 1-2 |
|
|
45. |
SUITABILITY OF THE LOW COST LEVEL
CROSSING SYSTEM FOR THE APPLICATIONS ON NSB (Norges StatsBahner) IN |
Siemens
Ltd. |
21st of June, 2001 |
pp. 1-4 |
|
|
46. |
Technical Description: THE LCLC (Siemens) LOW COST LEVEL CROSSING SYSTEM |
Siemens
Ltd. |
28th of September, 2001 |
pp. 1-12 |
|
|
47. |
Technical Description: FTC (Siemens) FREQUENCY-OPERATED TRACK CIRCUITS |
Siemens
Ltd. |
15th of November, 2001 |
pp.1-15 |
|
|
48. |
TECHNICAL
DESCRIPTION: LOW COST ERTMS / ETCS Level 3 - |
Siemens
Ltd. |
31st of January, 2002 |
pp.1-34 |
|
|
49. |
SIGNALLING MARKET IN |
Siemens
Ltd. |
14th of July, 2002 |
pp.1-20 |
|
|
50. |
PERSPECTIVE
PRODUCTS FOR MARKET IN |
Siemens
Ltd. |
20th of October, 2002 |
pp.1-7 |
|
For any additional information email us at